Our Blog Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lacinia velit a feugiat finibus. Morbi iaculis diam id tellus iaculis, eu pretium metus fermentu Blog test Our Blog Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lacinia...
Featured Properties View Listing San Francisco, CA $954,000 Beds: 5 Baths Sq. Ft. 2,503 View Listing Single Family Home $654,000 1,654 Sq Ft. • 2 Beds • 2 Baths 564 Elegant Ave. San Francisco, CA 39244 View Listing Single Family Home $1,012,895 2,938 Sq Ft. • 5...
System for soak-degreasing* metal parts Shorter degreasing time achieved by flexible operation settings with the ROBO Cylinder System Overview 1. Explanation of Process This is a degreasing process for metal parts before they are plated. The operator sets a basket...
Gear Shaft Press-fitting System Achieving 0% defect rate by shortening the cycle time and changeover time through optimal settings System Overview 1. Explanation of Process This is a process for assembling gear parts with shafts for toys. A metal shaft is press-fit...
System for inspecting/transferring stud bolt material A simple system configuration to reduce the cycle time by 44% System Overview 1. Explanation of Process Material, round bars, are checked for outer diameter before rolling. Acceptable bars are placed on the...
Automatic Sorting System Changing the speed during movement to reduce the cycle time by 20% System Overview 1. Explanation of Process Cardboard boxes containing CDs travel on a conveyor. There are five different types of cardboard boxes, and each type contains...
Easy Automation Improvement Example Vol.9-1 Automatic Sorting System Changing the speed during movement to reduce the cycle time by 20% System Overview This is a reduction gear manufacturing line. The cutting process cuts shaft parts to a specified length, orients...